By Dave Chapman, President
Review your manufacturing disaster recovery plan before each storm season and after changes that affect recovery. New equipment, applications, locations, vendors, staff responsibilities, and production workflows can all require an update. Test findings and actual incidents should also feed back into the plan. An annual review provides a checkpoint, but it does not replace updates after important changes.
Use the Seasonal Review as a Full Checkpoint
A pre-season review gives the team a scheduled opportunity to confirm that the plan still matches the factory. Leave enough time to resolve problems and conduct any needed tests before weather conditions make travel or site access more difficult.
Review the system inventory, backup coverage, recovery objectives, contact list, and restart procedures together. A current contact sheet will not help much beside an outdated restore instruction.
I would also ask what has changed since the last exercise. The answer often identifies more useful work than simply rereading the plan from the first page.
Update the Plan as the Facility Changes
The recovery plan should be part of a change, not a separate document somebody remembers months later. A new server, an equipment upgrade, or a software migration may alter what must be restored and how the team restores it.
Check the effect on backup coverage and recovery instructions before treating the change as complete. Record the new owner, vendor, location, and dependency where applicable.
Microsoft's disaster recovery guidance also calls for plan updates as architecture and recovery processes change. The practical manufacturing question is whether the current instructions still describe the systems now supporting production.
|
Review trigger |
What to revisit |
|---|---|
|
Before storm season |
Staffing, access, utilities, contacts, recovery priorities, and test readiness |
|
New or replaced equipment |
Configurations, backup coverage, vendor involvement, and restart checks |
|
Application or cloud changes |
Data location, recovery method, access, and connected systems |
|
Staffing or vendor changes |
Responsibilities, escalation contacts, permissions, and available expertise |
|
Production or facility changes |
Dependencies, acceptable downtime, quality checks, and physical access |
|
A recovery test or real incident |
Failed steps, actual timing, missing information, and corrective actions |
The review should produce specific changes. Signing an annual review date without checking the environment does not keep the plan current.
Keep Recovery Targets Tied to Production
A recovery target that suited last year's operation may no longer fit. Additional shifts, tighter delivery commitments, or a new temperature-sensitive process can change how much interruption the business can tolerate.
Ask operations and finance to revisit downtime and data-loss expectations. Compare those expectations with the latest test results and the service scope in place.
A shorter target written into the plan does not make recovery faster. The team needs to identify the technical, staffing, and testing changes required to support it, then budget for those changes.
Check People and Contacts as Carefully as Systems
An employee may change roles while their name remains beside an important recovery task. A vendor may update its support route without the factory's contact sheet being revised.
Verify primary contacts, alternate contacts, after-hours arrangements, and the person authorized to approve urgent work. Include the internal staff responsible for communicating with employees and customers.
Store the current plan where authorized responders can obtain it during the outage it describes. Access to the document should not depend entirely on the same system the team is trying to recover.
Close the Loop After Every Test
A test report is useful only when its findings change the plan or the environment. Assign each issue, record the required action, and confirm completion with an appropriate follow-up check.
Keep a record of the systems tested, the recovery point used, elapsed time, and any conditions that limited the exercise. The next reviewer should be able to distinguish a tested recovery step from an assumption that has never been exercised.
Update the controlled copy of the plan after the corrections. Remove outdated copies from the places responders use, while keeping the version history needed to understand previous changes.
Make Ownership Part of Routine Work
One person should coordinate the recovery plan, even though several teams contribute. That owner can gather updates from IT, operations, maintenance, quality, and outside providers rather than expecting each group to maintain a separate plan.
Use existing maintenance and technology meetings to identify changes affecting recovery. This keeps the work connected to production decisions without waiting for the annual review.
Our page on coordinating OT and IT recovery explains why shared dependencies and decision owners belong in that same document.
One Up Solutions Northwest's Perspective
I would rather keep a recovery plan current through small, recorded updates than rebuild it from memory before each storm season. The important changes are the ones that alter what your team restores, who does the work, or how production returns safely.
One Up Solutions Northwest can review the IT recovery steps alongside your operations team. That gives the business a practical way to connect day-to-day changes with its next recovery exercise.
"Excellent service and up-to-date technical expertise. I rely on Dave Chapman to keep my business systems working and ready for the future."
Pablo Anaya
FAQs About Recovery Plan Updates
Is one annual review enough?
It is a useful checkpoint, but significant changes need their own updates. A new production system or support provider can affect recovery long before the next scheduled annual review.
Do we need to update the plan after every software patch?
Review the effect on recovery. A change to compatibility, restore steps, configurations, dependencies, or vendor support should be reflected in the plan. Routine changes should remain documented through the normal change process.
Who should own the manufacturing recovery plan?
Name one coordinator with access to the relevant teams and leadership. IT, operations, maintenance, quality, and vendors may own different tasks, but the plan needs a single process for keeping those tasks consistent.
Should a successful test lead to a plan update?
Record the result even when no corrective change is needed. The test date, scope, conditions, and measured timing provide evidence for the next review and help prevent old assumptions from being treated as current results.
Next Step
Schedule a recovery plan review ahead of your next storm season, or now if the plan hasn’t been checked since your last change. Bring the current plan, recent changes, and the last test results so the discussion can focus on what needs updating and which steps need another test.